Friday 24 February 2012


Congratulations to both dedicated secretaries of GNB. They are young, yet they are passionate and concern about what they can contribute, even if it is little, to protect the environment. Let's change a little of ourselves and give a big impact to the environment today.  Reduce, Reuse and Separate.

Thursday 23 February 2012

Urgent Needs to Achieve Proper Waste Segregation at Source

       The federal government agency, National Solid Waste Management Department (JPSPN) has recently promotes the notion of waste separation at source by distributing free 120 L Mobile Garbage Bin (MGB) to household in Kuala Lumpur. Since the Solid Waste and Public Cleansing Management Act 2007 (Act 672) fully enforced in September 2011, JPSPN is adamant on implementing waste segregation at source system. A new waste collection system of “2+1” was proposed and is in trial in about 400 households in Putrajaya. The “2+1” collection system has two times collection of residual waste (general waste) and one time collection of recyclable materials in a single week. In Putrajaya, two 120 L MGBs were provided to the participating households to facilitate the segregation of residual waste and recyclable materials. According to the CEO of Alam Flora Sdn Bhd (the waste concessionaire for KL, Pahang, Terengganu and Kelantan), Mohd Zain Hassan, the two-bin system is working well at Putrajaya. The two MGBs have different color on the cover lid and are labeled with guidelines on the body of the bin. 


        The justification behind the distribution of free MGB to households in Kuala Lumpur is the need to provide necessary infrastructure to enable the separation of waste. According to the Director-General of JPSPN, Dato’ Nadzri Yahaya, the awareness on waste segregation is there but there is no infrastructure in term of collection which has to be addressed first and provision of free MGB is the first step. Besides, he clarified that the MGB is allocated for premises and not for house owner as many had misunderstood. Another purpose of the distribution of 120L MGB is to enable to operation of the new refuse collection vehicle (RCV) of Alam Flora which is equipped with a bin lifter for MGB (mechanized waste collection method), according to Dato’ Nadzri in a waste seminar in UM in January 2012.  With the rise in labor and insurance premium costs, mechanized collection system has become a popular option for most municipalities in some developed countries especially in Europe. In this system, standardized container (MGB) is required and it is designed specifically to work with the container-unloading mechanism using a lifter attached to the RCV.


     The intention of government to promote waste segregation at source is applauded but the implementation method is not pragmatic as it is predominantly a “top-down” approach. The lack of public consultation always results in creating implementation constraints and fails to achieve the initial objectives. The similar phenomenon might happen in this case of MGB distribution, in the author’s opinion. So far, 72,796 out of the 254,220 MGB allocated for Kuala Lumpur had been distributed, and it costs about RM 9.5 million as one 120L MGB cost about RM130. Total of 254,220 MGB for Kuala Lumpur would costs a staggering RM 33 million! The cost and benefit of this purchase of MGB has to be carefully analyzed as it consumes a significant cost, which is equivalent to the capex (Capital Expenditure) of a mass scale anaerobic digester (100 ton/day) and for composting facility, the capacity can be up to 200 ton/day. If waste separation at source is practiced by the significant percentage of households (assume more than 50%), the distribution of MGB may be justified. Three arguments are discussed to justify the rather exorbitant action of distributing the 120L MGB to households to facilitate program in relation to waste separation at source.


        Secondly, there is a lack of public consultation in this program. The distribution of MGB is to the surprise of many households as there is no prior information before the move. JPSPN should consult the communities in Kuala Lumpur, at least by engaging the representatives of residential associations (RA) about the objectives of the distribution and seek their opinion in this regard as they know better of the existing waste collection system in their respective communities and would be able to provide good suggestions on waste separation at source. Some of the households may not like the concept of having a MGB as there is a small waste storage room beside the gate to store the rubbish bags, while others may have their own bins. Some may keep the MGB in their house in worry of their MGB being stolen. Some may even misunderstand the function of the MGB and ends up abusing its function. Even if most of the households may accept the MGB, at least, public hearing sessions should have been carried out to inform the public, as the main stakeholders of the collection system about the roles and functions of the MGB. 


    The third argument is the technical logistic of mechanized waste collection. In Malaysia, most of the housing area is terrace houses, with some semi-detached and detached houses. The distance between one house to another for terrace house is barely 5-10 meters, depended on the size of house. The short distance between the points of collection will lengthen the pick-up time; besides require more energy for lifting the MGB. The longer pick-up time will in turn reduce the overall operation efficiency. Mechanized collection system is more suitable detached dwellings which distance between houses is longer and for “Alley” collection or communal bin such as a MGB 660L or 1100L which contain more waste and not ergonomically effective to load manually. Besides, the reduction of waste crews is not significant with mechanized system, with the most is one worker reduction, as in Malaysia set-out of bin is not practiced as the short distance between bin locations to the road. Normally, waste crews transfer the rubbish bags directly from the waste bins to the RCV manually, or transfer the MGB manually to the RCV for unloading. The mechanized system with lifter can only save the work of tilting of MGB to unload the waste into the compactor chamber of RCV. Therefore, it is actually a “semi-mechanized” waste collection system. Besides, the maintenance cost of RCV will be increased with mechanized collection system. With longer pick-up time, higher maintenance cost and more energy intensive, it is not feasible to use mechanized collection method for terrace houses. 
     
       The benefits of mechanized collection are reduction of spillage incidences and reduction of one waste crew for each RCV. However, almost 99% of leachate comes from the compaction of waste in the RCV based on observation at numerous housing areas. The transfer of rubbish bags has very minimal leachate or spillage incidence. As for reduction of waste crew, theoretically it is supposed to be, but for the real case scenario in Malaysia, it is yet to be seen. Nonetheless, reduction of crews means loss of job opportunity. The cost of hiring a crew for manual collection and the cost of lifter installation, extra energy consumption and maintenance cost of lifter has to be carefully analyzed for decision making. Besides, the other dominant factor is the types of service areas or types of premises/houses has to be accounted in the analysis, which mechanized system may be suitable and efficient for detached dwellings and communal bin (660L MGB, bulk bin, leach bin, etc) but not the others. For example, if MGBs are set-out by residents in a specific area for high rise premises such as condo/apartment, the collection with mechanized system may be more efficient than manual. At the end of the day, optimization of collection operation doesn’t correlate with mechanized or manual system, but more on the management by service areas.    
     
       Nevertheless, there are still some positive sides of the distribution of 120L MGB. Firstly, the standardization of waste receptacle serves as a foundation to improve the entire waste collection services. It includes the mechanized collection (if found feasible to be implemented), waste generation audit purposes, better waste handling method (the wheel of MGB enable its movement without have to carry the bin), reduce disturbance by rodents and stray animal with cover on the MGB and the MGB is more durable and better quality performance compared to normal waste bin. Therefore, even without the implementation of mechanized collection system, the use of MGB can actually improve the collection services. However, the prior argument here is the objectives, roles and functions of the single 120L MGB for each household is not clearly stated or delivered to the households. At the moment, JPSPN has to begin disseminate the information about the comprehensive intentions of the MGB distribution to the involved households, either by mass media, brochure or if best to have public consultation session to each involved RA. At the same time, a program or scheme on waste separation at source has to be introduced and enforced with new rules and regulations which JPSPN can be the implementing agency. The public engagement is imperative to inform the public of the need to segregate their waste, what kind of program or scheme will be introduced, what kind of facility (e.g. 120L MGB) will be provided to facilitate the program, how is the modus operandi of the program/scheme and what kind of regulations will be imposed pertaining to the separation at source policy. Otherwise, once after a period of one or two years have passed without any program, most the MGB will definitely be abused or disappeared, implying another case of waste of taxpayers’ money.       
    
       In a nutshell, the distribution of MGB for separation at source shows the government urgency to improve the waste management system in the country. However, the lack of proper planning, inadequate implementation strategy and insufficient expertise in public engagement will impede the implementation and ends up not achieving its original objectives. Thus, we urgesthe federal government, represented BY JPSPN to take the necessary action to ensure the objectives of the distribution of MGB are met.   





Prepared by,

Jaron Keng
Secretary
Malaysian Green and Blue Environmental Protection Society
Tel: 016 530 6610 



Monday 20 February 2012

GnB on FM98.8

The Green & Blue Group were interviewed by the DJ Athena from FM98.8 and it was aired on last Friday (dated 17th FEb 2012) at 8.55am. Here's the 5 minutes interview session in Chinese version. Hope you'll enjoy it!

FM988 2012 Like Awards: The Green and Blue Group

Athena and The Green & Blue Group 

We received a 'Like' award as a recognition for the NGO's effort.